Saudi Arabia leads the GCC with ~100 facilities; UAE second at ~70
IT Capacity Pipeline 2027 (MW) — Key Projects
DataVolt/NEOM alone represents 1,500 MW — largest single project in the region
GCC DC Market Investment ($B)
UAE leads announced investments at $20.5B+, driven by G42/OpenAI mega-campus
GCC Market Scorecard
Comparative overview of all six GCC data center markets
Market
Existing Cap.
Pipeline
Key Operators
Market Size
🇸🇦 Saudi Arabia
~410 MW
~2.3 GW
AWS, Microsoft, DataVolt, STC
$2.1B (2026)
🇦🇪 UAE
~400 MW
~1.2 GW
G42, Khazna, Microsoft, du
$20.5B+ invest.
🇶🇦 Qatar
~80 MW
TBD
QIA/Brookfield, G42
$20B venture
🇰🇼 Kuwait
~40 MW
TBD
Google Cloud, Microsoft
$0.1B+
🇴🇲 Oman
~30 MW
Growing
ITC SEZ operators
$0.3B
🇧🇭 Bahrain
~25 MW
Moderate
AWS, INJAZ
$0.4B
📍 GCC Data Center Map
Interactive map — Saudi Arabia, UAE, Qatar, Kuwait, Oman, Bahrain
-- projects
-- tracked
-- capacity
📍 Global AI Data Center Map
$700B+ in AI infrastructure construction worldwide
-- projects
-- tracked
-- capacity
KSA DC Market 2026
$2.1B
Baseline market value
Power Cost Advantage
30–35%
Below USA average
KSA Cloud SEZ
✓ Active
Tax + fast-track licensing
Subsea Connectivity
Strong
KSA + UAE hub nodes
Industrial Electricity Prices by Country 2024 (EUR ct/kWh)
GCC prices 30–35% below USA and 50%+ below EU-27 — structural cost advantage
Key GCC Government Incentives
KSA and UAE offer the broadest incentive stacks; Kuwait leads on electricity cost
Power & Policy Advantage: MENA power prices are 30–35% below USA and 50%+ below EU-27. KSA Cloud Computing SEZ offers tax exemptions and fast-track licensing for qualifying operators. UAE ADGM/DIFC free zone structures enable data sovereignty and flexible ownership. Qatar QFC supports cloud infrastructure investment with competitive incentives. These structural advantages are amplified by long-term gas-linked tariff agreements and growing renewable energy commitments.
KSA Industrial Power
5.3
EUR ct/kWh (2024)
UAE Industrial Power
7.8
EUR ct/kWh (2024)
Kuwait Power
3.3
Lowest in GCC
KSA Renewable Target
60 GW
Wind + Solar by 2030
UAE Clean Energy
44%
Target by 2050
Industrial Electricity Prices — GCC vs Global 2024 (EUR ct/kWh)
Kuwait (3.3) is cheapest globally; all GCC markets undercut USA (9.4) and EU-27 (14.8)
Renewable Energy Capacity Targets 2030 (GW, Wind + Solar)
KSA's 58.7 GW target enables ESG-aligned PPAs supporting long-run DC power cost stability
GCC structural power cost advantage is sustainable — gas-linked tariffs with long-term agreements possible. KSA National DC Strategy 2025 aligns grid planning with data center demand, ensuring supply security. UAE clean energy commitment (44% by 2050) enables ESG-aligned Power Purchase Agreements attractive to global hyperscalers. Kuwait offers the cheapest electricity in the GCC at 3.3 EUR ct/kWh. Renewable buildout across KSA and UAE reduces long-term fossil fuel price exposure for data center operators.
DC Market Value
$2.1B
2026 baseline
IT Load Capacity
~0.41 GW
Operational
Target by 2030
1.5 GW
National DC Strategy
DC Count
~100
Active facilities
Market 2031
$4.35B
~15% CAGR
GDP
$1.06T
Vision 2030
Cloud SEZ
✓
Tax + customs exempt
National DC Strategy
2025
Systems-level approach
KSA DC Market by Hub
Riyadh is primary hyperscale nucleus; NEOM/Oxagon dominates pipeline with DataVolt 1.5 GW
KSA IT Capacity by Status (MW)
Committed pipeline (DataVolt) dwarfs current operational base — 3.7× existing capacity
Saudi Arabia is the GCC's dominant data center market by pipeline. The National DC Strategy (2025) formalises a systems-level approach aligning grid capacity, affordability, and energy transition. The Cloud Computing SEZ offers tax and customs exemptions plus fast-track licensing. DataVolt's 1.5 GW NEOM project alone represents ~55% of planned national capacity — a transformative commitment that signals Saudi Arabia's ambition to become the region's AI infrastructure hub.
KSA Key Data Center Projects — Jan 2026
Project
Location
Capacity
Investment
Status
Notes
DataVolt / NEOM
NEOM / Oxagon
1,500 MW
$5B
Announced 2025
AI/Cloud mega-campus
AWS
Riyadh
300 MW
$5.3B
Final construction
Hyperscale cloud region
STC / China Mobile Intl.
Riyadh / Dammam
187 MW
$1.9B
Final construction (Phase 1)
National telco + hyperscale
Equinix
Riyadh
100 MW
$1B
Announced 2025
Colocation + interconnection
ICS Arabia Desert Dragon
Riyadh / Jeddah / Dammam
65+50 MW+Phase 3
Undisclosed
Multi-city rollout
Enterprise + hyperscale colo
AirTrunk / Humain
Riyadh
Undisclosed
Undisclosed
Announced
AI-optimised hyperscale
Microsoft
Riyadh + Dammam
Undisclosed
Part of $15.2B UAE+KSA
Announced
Cloud region + AI services
KSA Projects — IT Capacity by Status (MW)
DataVolt NEOM dwarfs all other projects — represents the region's largest single commitment
KSA attracts global hyperscalers (AWS $5.3B, Microsoft, Equinix $1B) plus state-backed mega-projects (DataVolt/NEOM $5B). The pipeline is dominated by the DataVolt 1.5 GW NEOM project. Riyadh is the primary hyperscale nucleus with AWS, Microsoft, STC/China Mobile, Equinix, and AirTrunk/Humain all competing for enterprise and cloud demand. NEOM/Oxagon represents a greenfield AI campus at unprecedented scale in the Middle East.
DC Count
~70
Active facilities
Existing Capacity
400+ MW
IT load
Pipeline to 2027
~1.2 GW
Announced projects
Power Price
7.8
EUR ct/kWh (2024)
Tech Economy Target
$300B
By 2031
G42 AI Campus
10 sq mi
Abu Dhabi (5 GW planned)
Microsoft UAE
$15.2B
Investment 2023–2029
Key Operators
G42/Khazna
+ Microsoft, du
UAE DC Hub Distribution
Abu Dhabi dominates at 55% — home to G42 AI campus and Microsoft/Khazna 200 MW facility
UAE Capacity by Status (MW)
Announced pipeline (600+ MW) triples the under-construction base — demand outpacing supply
UAE Key Hubs
Hub
Focus
Key Projects
Abu Dhabi
G42/Khazna HQ — AI mega-campus
G42 + OpenAI/Oracle 1 GW ($20B); Microsoft + Khazna 200 MW; Khazna 100 MW national cloud
UAE is the GCC's most advanced data center ecosystem.Abu Dhabi's G42 AI campus (10 sq miles, 5 GW planned) is the largest AI facility outside the US. Microsoft's $15.2B commitment (2023–2029) signals long-term hyperscale anchor investment. UAE benefits from ADGM data sovereignty, free zone ownership structures, and strategic proximity to key subsea cable landing stations. The UAE-US AI Acceleration Partnership further cements Abu Dhabi's status as a global AI infrastructure hub.
UAE Key Data Center Projects — Jan 2026
Project
Location
Capacity
Investment
Status
Notes
G42 / Khazna / OpenAI / Oracle / NVIDIA
Abu Dhabi
1 GW initial; 5 GW full
$20B
Announced 2025
World's largest AI campus outside US
Microsoft / Khazna
Abu Dhabi
200 MW
Part of $15.2B UAE commitment
Announced 2025
Cloud + AI region expansion
Khazna DC
Abu Dhabi
100 MW
Not disclosed
Final construction 2024
National cloud infrastructure
du / Microsoft
Dubai / UAE
Undisclosed
$0.5B
Announced 2025
Integrated telco-cloud platform
UAE–US AI Campus (G42)
Abu Dhabi
5 GW phased
$15.2B (Microsoft alone)
Phase 1 deploying
Largest AI facility outside US
DAMAC
UAE + USA
Multi-campus
$20B (US-focused)
Announced 2025
UAE capital source; US deployment
UAE Projects — Capacity Breakdown (MW, known figures)
G42/OpenAI campus at 1,000 MW (initial) anchors the UAE pipeline — AI-first architecture
UAE attracts the world's largest AI infrastructure capital. The G42/OpenAI/Oracle/NVIDIA campus ($20B, 5 GW full build) is set to become the world's largest AI facility outside the United States. Microsoft's $15.2B UAE commitment (2023–2029) is the largest single tech investment in the region's history. The du/Microsoft partnership integrates telco and cloud at scale for enterprise customers. ADGM free zone and data sovereignty laws make Abu Dhabi the preferred location for AI-sensitive workloads.
QIA/Brookfield Venture
$20B
Global DC platform
Status
Announced
2025 commitment
G42 Partnership
✓
Regional DC buildout
Subsea Cables
Growing
Regional connectivity hub
Qatar Key Projects
Operator
Structure
Investment
Status
Notes
QIA / Brookfield Asset Mgmt.
Joint platform
Part of $20B global venture
Announced 2025
Sovereign-backed DC investment vehicle
G42 (UAE partnership)
Regional expansion
Undisclosed
Active
Cross-border GCC AI infrastructure
Qatar's QIA is deploying sovereign wealth into data center infrastructure via its $20B joint venture with Brookfield Asset Management — one of the largest DC commitments globally. The Qatar Finance Centre (QFC) supports cloud infrastructure investment. Qatar's growing subsea cable connectivity enhances its role as a regional data hub alongside KSA and UAE.
Google Cloud
$0.1B
Announced 2024
Microsoft
Undisclosed
Announced 2025
Power Cost
3.3
EUR ct/kWh — GCC lowest
KIA AI Partnership
$40B
AI Infrastructure Partnership
Kuwait Key Projects
Operator
Investment
Status
Notes
Google Cloud
$0.1B
Announced 2024
Cloud region deployment
Microsoft
Undisclosed
Announced 2025
Cloud + AI services
KIA (via AI Infra. Partnership)
Portion of $40B
Active 2025
Sovereign AI infra. co-investment
Kuwait offers the lowest industrial electricity prices in the GCC at 3.3 EUR ct/kWh — a significant operational cost advantage. Both Google Cloud and Microsoft have committed to Kuwait deployments (2024–2025). The Kuwait Investment Authority (KIA) participates in the $40B AI Infrastructure Partnership, aligning sovereign capital with global AI infrastructure buildout. Market scale remains smaller than KSA/UAE but growing.
ITC SEZ
Active
Tech special economic zone
Power Cost
6.5
EUR ct/kWh — competitive
Strategy
Vision 2040
Digital economy goal
Subsea Cables
Growing
Submarine cable connectivity
Oman is an emerging GCC data center market with competitive incentives via the ITC Special Economic Zone. Power costs at 6.5 EUR ct/kWh are competitive globally, though above Kuwait and Qatar. Vision 2040 sets a digital economy transformation agenda. Growing submarine cable connectivity enhances Oman's strategic position as an alternative DC destination. Multiple smaller projects are underway, and the market is attracting increasing interest from regional operators seeking non-KSA/UAE diversification.
Amazon AWS Region
2019
First Middle East region
Data Protection
PDPL 2019
Data hosting regulations
INJAZ Tech Hub
Active
Startup + DC ecosystem
Gov. Cloud Policy
Cloud First
Public sector mandate
Bahrain is the GCC's most established smaller market.Amazon AWS launched the first Middle East cloud region in Bahrain in 2019, validating the market. The Personal Data Protection Law (PDPL 2019) provides a regulatory framework for data hosting. The government's Cloud First policy drives public sector demand. The INJAZ tech hub supports the broader digital ecosystem. While the smallest GCC market by scale, Bahrain has a mature operational track record and established connectivity infrastructure.
Other GCC — Key Metrics Comparison
Qatar leads on announced investment ($20B+); Kuwait leads on power cost advantage (3.3 EUR ct/kWh)