GCC Data Center Markets

Newmark MENA Data Center Snapshot — Jan 2026

MENA Data Centers
~390
Total facilities 2026
MENA Existing Cap.
1.2+ GW
IT load capacity
MENA Pipeline 2027
~5 GW
Planned IT capacity
New MENA Investment
$12B
By 2027
KSA Pipeline Share
45%+
Of MENA total
UAE Data Centers
~70
Active facilities

Number of Data Centers by Country

Saudi Arabia leads the GCC with ~100 facilities; UAE second at ~70

IT Capacity Pipeline 2027 (MW) — Key Projects

DataVolt/NEOM alone represents 1,500 MW — largest single project in the region

GCC DC Market Investment ($B)

UAE leads announced investments at $20.5B+, driven by G42/OpenAI mega-campus

GCC Market Scorecard

Comparative overview of all six GCC data center markets

MarketExisting Cap.PipelineKey OperatorsMarket Size
🇸🇦 Saudi Arabia~410 MW~2.3 GWAWS, Microsoft, DataVolt, STC$2.1B (2026)
🇦🇪 UAE~400 MW~1.2 GWG42, Khazna, Microsoft, du$20.5B+ invest.
🇶🇦 Qatar~80 MWTBDQIA/Brookfield, G42$20B venture
🇰🇼 Kuwait~40 MWTBDGoogle Cloud, Microsoft$0.1B+
🇴🇲 Oman~30 MWGrowingITC SEZ operators$0.3B
🇧🇭 Bahrain~25 MWModerateAWS, INJAZ$0.4B

📍 GCC Data Center Map

Interactive map — Saudi Arabia, UAE, Qatar, Kuwait, Oman, Bahrain
-- projects
-- tracked
-- capacity

📍 Global AI Data Center Map

$700B+ in AI infrastructure construction worldwide
-- projects
-- tracked
-- capacity

KSA Industrial Power
5.3
EUR ct/kWh (2024)
UAE Industrial Power
7.8
EUR ct/kWh (2024)
Kuwait Power
3.3
Lowest in GCC
KSA Renewable Target
60 GW
Wind + Solar by 2030
UAE Clean Energy
44%
Target by 2050

Industrial Electricity Prices — GCC vs Global 2024 (EUR ct/kWh)

Kuwait (3.3) is cheapest globally; all GCC markets undercut USA (9.4) and EU-27 (14.8)

Renewable Energy Capacity Targets 2030 (GW, Wind + Solar)

KSA's 58.7 GW target enables ESG-aligned PPAs supporting long-run DC power cost stability

GCC structural power cost advantage is sustainable — gas-linked tariffs with long-term agreements possible. KSA National DC Strategy 2025 aligns grid planning with data center demand, ensuring supply security. UAE clean energy commitment (44% by 2050) enables ESG-aligned Power Purchase Agreements attractive to global hyperscalers. Kuwait offers the cheapest electricity in the GCC at 3.3 EUR ct/kWh. Renewable buildout across KSA and UAE reduces long-term fossil fuel price exposure for data center operators.
DC Market Value
$2.1B
2026 baseline
IT Load Capacity
~0.41 GW
Operational
Target by 2030
1.5 GW
National DC Strategy
DC Count
~100
Active facilities
Market 2031
$4.35B
~15% CAGR
GDP
$1.06T
Vision 2030
Cloud SEZ
✓
Tax + customs exempt
National DC Strategy
2025
Systems-level approach

KSA DC Market by Hub

Riyadh is primary hyperscale nucleus; NEOM/Oxagon dominates pipeline with DataVolt 1.5 GW

KSA IT Capacity by Status (MW)

Committed pipeline (DataVolt) dwarfs current operational base — 3.7× existing capacity

KSA Capacity Progress — Path to 2030 Target

Operational Capacity410 MW
Under Construction300 MW
Committed Pipeline (DataVolt)1,500 MW
2030 Target (National Strategy)1,500 MW

Regional Hubs — KSA

HubRoleKey Operators / Projects
RiyadhPrimary hyperscale clusterAWS, Microsoft, ICS Arabia Desert Dragon (65 MW), Ezditek RUH01, AirTrunk/Humain
NEOM / OxagonLargest upcoming hubDataVolt 1.5 GW (~55% of national planned capacity)
JeddahEnterprise + hyperscale coloICS Arabia Desert Dragon Phase 2 (50 MW) + enterprise colocation
DammamCloud region + Phase 3Microsoft region + ICS Arabia Phase 3 assets
Saudi Arabia is the GCC's dominant data center market by pipeline. The National DC Strategy (2025) formalises a systems-level approach aligning grid capacity, affordability, and energy transition. The Cloud Computing SEZ offers tax and customs exemptions plus fast-track licensing. DataVolt's 1.5 GW NEOM project alone represents ~55% of planned national capacity — a transformative commitment that signals Saudi Arabia's ambition to become the region's AI infrastructure hub.

KSA Key Data Center Projects — Jan 2026

ProjectLocationCapacityInvestmentStatusNotes
DataVolt / NEOMNEOM / Oxagon1,500 MW$5BAnnounced 2025AI/Cloud mega-campus
AWSRiyadh300 MW$5.3BFinal constructionHyperscale cloud region
STC / China Mobile Intl.Riyadh / Dammam187 MW$1.9BFinal construction (Phase 1)National telco + hyperscale
EquinixRiyadh100 MW$1BAnnounced 2025Colocation + interconnection
ICS Arabia Desert DragonRiyadh / Jeddah / Dammam65+50 MW+Phase 3UndisclosedMulti-city rolloutEnterprise + hyperscale colo
AirTrunk / HumainRiyadhUndisclosedUndisclosedAnnouncedAI-optimised hyperscale
MicrosoftRiyadh + DammamUndisclosedPart of $15.2B UAE+KSAAnnouncedCloud region + AI services

KSA Projects — IT Capacity by Status (MW)

DataVolt NEOM dwarfs all other projects — represents the region's largest single commitment

KSA attracts global hyperscalers (AWS $5.3B, Microsoft, Equinix $1B) plus state-backed mega-projects (DataVolt/NEOM $5B). The pipeline is dominated by the DataVolt 1.5 GW NEOM project. Riyadh is the primary hyperscale nucleus with AWS, Microsoft, STC/China Mobile, Equinix, and AirTrunk/Humain all competing for enterprise and cloud demand. NEOM/Oxagon represents a greenfield AI campus at unprecedented scale in the Middle East.
DC Count
~70
Active facilities
Existing Capacity
400+ MW
IT load
Pipeline to 2027
~1.2 GW
Announced projects
Power Price
7.8
EUR ct/kWh (2024)
Tech Economy Target
$300B
By 2031
G42 AI Campus
10 sq mi
Abu Dhabi (5 GW planned)
Microsoft UAE
$15.2B
Investment 2023–2029
Key Operators
G42/Khazna
+ Microsoft, du

UAE DC Hub Distribution

Abu Dhabi dominates at 55% — home to G42 AI campus and Microsoft/Khazna 200 MW facility

UAE Capacity by Status (MW)

Announced pipeline (600+ MW) triples the under-construction base — demand outpacing supply

UAE Key Hubs

HubFocusKey Projects
Abu DhabiG42/Khazna HQ — AI mega-campusG42 + OpenAI/Oracle 1 GW ($20B); Microsoft + Khazna 200 MW; Khazna 100 MW national cloud
DubaiEnterprise + telco clouddu/Microsoft 500 MW announced; DAMAC planned US-linked investments
SharjahEmerging hubEnterprise colocation, lower land costs
Other UAESupporting marketsFree zone structures, smaller colo operators
UAE is the GCC's most advanced data center ecosystem. Abu Dhabi's G42 AI campus (10 sq miles, 5 GW planned) is the largest AI facility outside the US. Microsoft's $15.2B commitment (2023–2029) signals long-term hyperscale anchor investment. UAE benefits from ADGM data sovereignty, free zone ownership structures, and strategic proximity to key subsea cable landing stations. The UAE-US AI Acceleration Partnership further cements Abu Dhabi's status as a global AI infrastructure hub.

UAE Key Data Center Projects — Jan 2026

ProjectLocationCapacityInvestmentStatusNotes
G42 / Khazna / OpenAI / Oracle / NVIDIAAbu Dhabi1 GW initial; 5 GW full$20BAnnounced 2025World's largest AI campus outside US
Microsoft / KhaznaAbu Dhabi200 MWPart of $15.2B UAE commitmentAnnounced 2025Cloud + AI region expansion
Khazna DCAbu Dhabi100 MWNot disclosedFinal construction 2024National cloud infrastructure
du / MicrosoftDubai / UAEUndisclosed$0.5BAnnounced 2025Integrated telco-cloud platform
UAE–US AI Campus (G42)Abu Dhabi5 GW phased$15.2B (Microsoft alone)Phase 1 deployingLargest AI facility outside US
DAMACUAE + USAMulti-campus$20B (US-focused)Announced 2025UAE capital source; US deployment

UAE Projects — Capacity Breakdown (MW, known figures)

G42/OpenAI campus at 1,000 MW (initial) anchors the UAE pipeline — AI-first architecture

UAE attracts the world's largest AI infrastructure capital. The G42/OpenAI/Oracle/NVIDIA campus ($20B, 5 GW full build) is set to become the world's largest AI facility outside the United States. Microsoft's $15.2B UAE commitment (2023–2029) is the largest single tech investment in the region's history. The du/Microsoft partnership integrates telco and cloud at scale for enterprise customers. ADGM free zone and data sovereignty laws make Abu Dhabi the preferred location for AI-sensitive workloads.
QIA/Brookfield Venture
$20B
Global DC platform
Status
Announced
2025 commitment
G42 Partnership
✓
Regional DC buildout
Subsea Cables
Growing
Regional connectivity hub

Qatar Key Projects

OperatorStructureInvestmentStatusNotes
QIA / Brookfield Asset Mgmt.Joint platformPart of $20B global ventureAnnounced 2025Sovereign-backed DC investment vehicle
G42 (UAE partnership)Regional expansionUndisclosedActiveCross-border GCC AI infrastructure
Qatar's QIA is deploying sovereign wealth into data center infrastructure via its $20B joint venture with Brookfield Asset Management — one of the largest DC commitments globally. The Qatar Finance Centre (QFC) supports cloud infrastructure investment. Qatar's growing subsea cable connectivity enhances its role as a regional data hub alongside KSA and UAE.
Google Cloud
$0.1B
Announced 2024
Microsoft
Undisclosed
Announced 2025
Power Cost
3.3
EUR ct/kWh — GCC lowest
KIA AI Partnership
$40B
AI Infrastructure Partnership

Kuwait Key Projects

OperatorInvestmentStatusNotes
Google Cloud$0.1BAnnounced 2024Cloud region deployment
MicrosoftUndisclosedAnnounced 2025Cloud + AI services
KIA (via AI Infra. Partnership)Portion of $40BActive 2025Sovereign AI infra. co-investment
Kuwait offers the lowest industrial electricity prices in the GCC at 3.3 EUR ct/kWh — a significant operational cost advantage. Both Google Cloud and Microsoft have committed to Kuwait deployments (2024–2025). The Kuwait Investment Authority (KIA) participates in the $40B AI Infrastructure Partnership, aligning sovereign capital with global AI infrastructure buildout. Market scale remains smaller than KSA/UAE but growing.
ITC SEZ
Active
Tech special economic zone
Power Cost
6.5
EUR ct/kWh — competitive
Strategy
Vision 2040
Digital economy goal
Subsea Cables
Growing
Submarine cable connectivity
Oman is an emerging GCC data center market with competitive incentives via the ITC Special Economic Zone. Power costs at 6.5 EUR ct/kWh are competitive globally, though above Kuwait and Qatar. Vision 2040 sets a digital economy transformation agenda. Growing submarine cable connectivity enhances Oman's strategic position as an alternative DC destination. Multiple smaller projects are underway, and the market is attracting increasing interest from regional operators seeking non-KSA/UAE diversification.
Amazon AWS Region
2019
First Middle East region
Data Protection
PDPL 2019
Data hosting regulations
INJAZ Tech Hub
Active
Startup + DC ecosystem
Gov. Cloud Policy
Cloud First
Public sector mandate
Bahrain is the GCC's most established smaller market. Amazon AWS launched the first Middle East cloud region in Bahrain in 2019, validating the market. The Personal Data Protection Law (PDPL 2019) provides a regulatory framework for data hosting. The government's Cloud First policy drives public sector demand. The INJAZ tech hub supports the broader digital ecosystem. While the smallest GCC market by scale, Bahrain has a mature operational track record and established connectivity infrastructure.

Other GCC — Key Metrics Comparison

Qatar leads on announced investment ($20B+); Kuwait leads on power cost advantage (3.3 EUR ct/kWh)